SAIDI
189 min per year
Average outage minutes (2023)
Alger-Delta Coop Electric Assn is a member-owned electric cooperative operating in Michigan under EIA identifier 305. It reports service to approximately 10,319 customer accounts and generated about $0.02 billion in annual electric revenue, with a service footprint spanning 49 ZIP codes. As a cooperative, its governance is accountable to its ratepayer-members rather than shareholders, which often shapes rate-setting and reinvestment priorities.
In 2023, the average Alger-Delta Coop Electric Assn customer experienced 189.1 minutes of power interruptions — a metric called SAIDI (System Average Interruption Duration Index). That sits within the 120–180 minute national benchmark range, indicating performance typical of U.S. distribution utilities. SAIFI — the average number of outage events per customer — was 1.04 for the same period, so customers statistically faced roughly 1 distinct interruption that year. Excluding major event days (hurricanes, ice storms), SAIDI drops to 110.9 minutes — the gap between that figure and the headline 189.1 reveals how much weather, not day-to-day infrastructure, drove outages.
The EIA dataset includes 4 years of continuous reporting (2020–2023) for Alger-Delta Coop Electric Assn, which lets you see whether reliability is trending up or down rather than judging from a single snapshot. SAIDI has increased from 166.2 to 189.1 minutes, which may reflect either worsening weather exposure or delayed grid modernization. All figures on this page come directly from EIA Form 861, the federal annual electric power industry survey, with service territory ZIPs sourced from OpenEI — you can cross-reference them with your own utility bill or use them when comparing providers before relocating.
SAIDI
189 min per year
Average outage minutes (2023)
SAIFI
1.04 interruptions/yr
Outage frequency (2023)
Customers
10,319
Served in Michigan
189 minutes per customer per year
Minutes without power per year (2023)
| Year | SAIDI (min) | SAIDI nMED | SAIFI | Customers |
|---|---|---|---|---|
| 2020 | 166.2 | 165.8 | 0.930 | 10,181 |
| 2021 | 194.1 | 54.7 | 1.008 | 10,287 |
| 2022 | 388.4 | 222.4 | 1.601 | 10,360 |
| 2023 | 189.1 | 110.9 | 1.045 | 10,412 |
SAIDI nMED = SAIDI without major event days. Source: EIA Form 861.
Alger-Delta Coop Electric Assn serves 49 ZIP codes in Michigan.
Alger-Delta Coop Electric Assn had a SAIDI of 189.1 minutes in 2023, meaning the average customer experienced about 189 minutes of outages that year. This is near the national average.
Alger-Delta Coop Electric Assn is classified as a Cooperative serving Michigan. Electric cooperatives are member-owned nonprofit utilities, typically serving rural areas.
SAIDI (System Average Interruption Duration Index) measures the average total minutes per year that a customer of Alger-Delta Coop Electric Assn experiences power outages. A lower SAIDI indicates better reliability. The national average is roughly 120-180 minutes per year, so comparing Alger-Delta Coop Electric Assn's SAIDI to that benchmark shows whether this utility is above or below average.
Alger-Delta Coop Electric Assn serves approximately 10,319 customers in Michigan. Customer count can affect reliability metrics because larger utilities may face different infrastructure challenges compared to smaller ones.
Alger-Delta Coop Electric Assn has 4 years of reliability data (2020-2023). SAIDI has remained relatively stable over this period. Review the trend table above for year-by-year detail.
SAIDI "without major event days" (SAIDI nMED) excludes outages caused by hurricanes, ice storms, and other catastrophic weather events. It better reflects day-to-day infrastructure reliability rather than vulnerability to extreme weather. Both standard SAIDI and SAIDI nMED are shown in the reliability trend table above.
Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the U.S. Energy Information Administration (EIA) Form 861. Consult a qualified professional before making decisions based on this data.
Read our methodology — how this data is sourced, computed, and verified.