Cooperative · Arkansas · EIA 6342

First Electric Coop Corp

Cooperative · Arkansas · 102K customers. According to the U.S. Energy Information Administration's EIA Form 861, reliability for 2023 shows SAIDI 692 minutes/customer.

Reliability verdict

First Electric Coop Corp shows near-benchmark chronic reliability in 2023: 193 minutes SAIDI excluding major events (692 minutes including them) across 102K customers.

692 min
SAIDI 2023
2.52
SAIFI 2023
193 min
SAIDI ex-MED
102K
Customers

Chronic reliability judged on SAIDI excluding major event days when reported (IEEE 1366). Source: EIA Form 861 · August 2026.

Subscribe to EIA updates

Signature read: long interruption minutes vs the 911 utility cohort (>258 min tercile cut).

What long-outage First Electric Coop Corp filings show

First Electric Coop Corp is a member-owned electric cooperative operating in Arkansas under EIA identifier 6342. It reports service to approximately 102,267 customer accounts and generated about $0.22 billion in annual electric revenue, with a service footprint spanning 103 ZIP codes. As a cooperative, its governance is accountable to its ratepayer-members rather than shareholders, which often shapes rate-setting and reinvestment priorities.

In 2023, the average First Electric Coop Corp customer experienced 692.5 minutes of power interruptions, a measure known as SAIDI, or System Average Interruption Duration Index. Excluding major weather events from that total, that falls inside the typical 120–180 minute national benchmark, in line with what most U.S. distribution utilities report. SAIFI, the average number of outage events per customer, was 2.52 for the same period, so customers statistically faced roughly 3 distinct interruptions that year. Strip out major event days (hurricanes, ice storms) and SAIDI falls to 192.5 minutes; the difference from the headline 692.5 shows how much of the outage total came from weather rather than everyday grid issues.

The EIA dataset includes 4 years of continuous reporting (2020–2023) for First Electric Coop Corp, which lets you see whether reliability is trending up or down rather than judging from a single snapshot. Over that span, SAIDI rose from 501.6 to 692.5 minutes, possibly reflecting tougher weather years or grid upgrades that have not caught up yet.

F
Reliability Score
19/100
First Electric Coop Corp · 3 of 3 dimensions reported

Based on this utility's own EIA Form 861 reliability record -- baseline (major-event- excluded) outage duration, total outage duration, and outage frequency -- each benchmarked against every reporting utility nationwide. Not a measure of electricity rates or customer service, which this portal does not track.

Baseline Reliability F 192.5 min/yr
SAIDI excluding major-event days — day-to-day grid performance
Total Outage Duration F 692.5 min/yr
SAIDI including storms and major events — the full-year experience
Outage Frequency F 2.52/yr
SAIFI — average number of interruptions per customer per year
SAIDI vs. national mean (341 min) 92.3%

692 min/year per customer

First Electric Coop Corp SAIDI

Annual minutes without electric service (2023)

692 SAIDI692 SAIDINat. avg 341341SAIDI692SAIDI

Below Average

SAIDI by year (2020-2023)

Minutes per customer-year · EIA Form 861

Year-by-year SAIDI for First Electric Coop Corp from the same EIA filings as the table below. Lower is better; major-event years can spike the headline figure.

Source: U.S. EIA Form 861 As of August 2026

First Electric Coop Corp SAIDI trend

0 100 200 300 400 500 600 700 2020 2021 2022 2023 501.6 156.1 298 692.5
Year-by-year SAIDI from the same EIA filings as the table below. Lower is better; major-event years can spike the headline figure.

First Electric Coop Corp vs the nationwide SAIDI distribution

Where this utility's headline SAIDI sits among every EIA Form 861 utility with a reported figure

692 Higher than most fewer outage minutes than 12% of 911 utilities

Utilities nationwide, banded by latest reported SAIDI (minutes)

Each bar is a band; taller bars hold more utilities. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source U.S. EIA Form 861 reliability filings · August 2026

Price vs. reliability

Where First Electric Coop Corp sits on price vs. reliability

Among the 781 U.S. utilities large enough to report both revenue per customer and a recent outage record, First Electric Coop Corp charges more per customer than 26% of them, and is more reliable (lower SAIDI) than 14% of them, placing it in the quadrant where it pays less and is less reliable. Revenue per customer and outage minutes are independent figures: paying more does not guarantee fewer outages.

First Electric Coop Corp vs. a 40-utility national peer sample, price percentile vs. reliability percentile. Scatter plot of 41 data points (bubble-sized by third dimension). 050100150 050100150 Best valuePays for itCheap + riskyWorst deal Price percentile Reliability percentile Point, Price percentile: 0 · Reliability percentile: 25Point, Price percentile: 3 · Reliability percentile: 37Point, Price percentile: 5 · Reliability percentile: 27Point, Price percentile: 8 · Reliability percentile: 75Point, Price percentile: 10 · Reliability percentile: 43Point, Price percentile: 13 · Reliability percentile: 87Point, Price percentile: 15 · Reliability percentile: 12Point, Price percentile: 18 · Reliability percentile: 20Point, Price percentile: 20 · Reliability percentile: 15Point, Price percentile: 23 · Reliability percentile: 72Point, Price percentile: 25 · Reliability percentile: 5Point, Price percentile: 30 · Reliability percentile: 100Point, Price percentile: 33 · Reliability percentile: 35Point, Price percentile: 35 · Reliability percentile: 60Point, Price percentile: 38 · Reliability percentile: 32Point, Price percentile: 40 · Reliability percentile: 40Point, Price percentile: 43 · Reliability percentile: 65Point, Price percentile: 45 · Reliability percentile: 47Point, Price percentile: 48 · Reliability percentile: 0Point, Price percentile: 50 · Reliability percentile: 10Point, Price percentile: 53 · Reliability percentile: 77Point, Price percentile: 55 · Reliability percentile: 82Point, Price percentile: 57 · Reliability percentile: 90Point, Price percentile: 60 · Reliability percentile: 70Point, Price percentile: 63 · Reliability percentile: 2Point, Price percentile: 65 · Reliability percentile: 62Point, Price percentile: 68 · Reliability percentile: 95Point, Price percentile: 70 · Reliability percentile: 67Point, Price percentile: 73 · Reliability percentile: 50Point, Price percentile: 75 · Reliability percentile: 45Point, Price percentile: 78 · Reliability percentile: 92Point, Price percentile: 80 · Reliability percentile: 17Point, Price percentile: 83 · Reliability percentile: 97Point, Price percentile: 85 · Reliability percentile: 30Point, Price percentile: 88 · Reliability percentile: 22Point, Price percentile: 90 · Reliability percentile: 80Point, Price percentile: 93 · Reliability percentile: 55Point, Price percentile: 95 · Reliability percentile: 85Point, Price percentile: 98 · Reliability percentile: 57Point, Price percentile: 100 · Reliability percentile: 52First Electric Coop Corp, Price percentile: 26 · Reliability percentile: 14
First Electric Coop Corp vs. a 40-utility national peer sample, price percentile vs. reliability percentile.

Revenue per customer: $2,180/year · Latest SAIDI: 692.5 minutes/year.

SAIDI 2023 breakdown: 692.5 minutes

Reliability Trend (2020–2023)

Year SAIDI (min) SAIDI nMED SAIFI Customers
2020 501.6 119.2 1.821 95,888
2021 156.1 116.8 1.465 97,594
2022 298.0 178.1 2.763 99,272
2023 692.5 192.5 2.525 100,885

SAIDI nMED = SAIDI without major event days. Source: EIA Form 861.

Service Area

First Electric Coop Corp serves 103 ZIP codes in Arkansas.

71601716027163971674719017190971949720017200272003720047200772011720127201372015720167201972020720227202372024720257202672034720377203872040720427204472045720467204872055720607206472065720667206772069720707207272073720767208172085720867208772088720997210272103721067211072111721177211872120721217212272125721267212772130721317213272134721357213672137721407214272143721507215272153721607216672167721687217372175721767217972199722067220972210722237233372523725307253472543725467255072560725687258172823728347285372857

Frequently Asked Questions

How reliable is First Electric Coop Corp?

First Electric Coop Corp had a SAIDI of 692.5 minutes in 2023 including major weather events, but 192.5 minutes excluding them (the IEEE-standard measure of day-to-day reliability, the gap reflects a major storm that year, not chronic performance). Excluding major storm impacts, this tracks roughly with the national average.

What type of utility is First Electric Coop Corp?

First Electric Coop Corp is classified as a Cooperative serving Arkansas.

How many customers does First Electric Coop Corp serve?

First Electric Coop Corp serves approximately 102,267 customers in Arkansas.

How has First Electric Coop Corp's reliability changed over time?

First Electric Coop Corp has 4 years of reliability data (2020-2023). SAIDI has remained relatively stable over this period. Review the trend table above for year-by-year detail.

Utility Profile

Type
Cooperative
State
Arkansas
Customers
102,267
Annual Revenue
$0.22B
EIA ID
6342

Utilities with similar EIA profiles

Two cross-state peer sets for First Electric Coop Corp. Same-state SAIDI neighbors stay in Read-with below; these neighborhoods are nearest other-state utilities with at least 10,000 reported customers.

Source: U.S. Energy Information Administration Form 861 annual electric power industry survey · ZIP service territory: OpenEI. Disclaimer: informational only, not professional advice. See full disclaimer · methodology.