SAIDI
70 min per year
Yearly outage minutes, on average (2023)
Salt River Project is a municipally-owned utility operating in Arizona under EIA identifier 16572. It reports service to approximately 1,141,630 customer accounts and generated about $3.40 billion in annual electric revenue, with a service footprint spanning 136 ZIP codes. Municipal ownership means a local board or city council typically oversees this utility, and it is exempt from federal income tax.
In 2023, the average Salt River Project customer experienced 70.0 minutes of power interruptions, a measure known as SAIDI, or System Average Interruption Duration Index. That is comfortably under the 120–180 minute national benchmark range, a sign of solid grid resilience and quick outage response. Over the same period, SAIFI (outage events per customer) was 1.01, putting the typical customer at roughly 1 distinct interruption that year. Excluding major event days (hurricanes, ice storms), SAIDI drops to 49.2 minutes, the gap between that figure and the headline 70.0 reveals how much weather, not day-to-day infrastructure, drove outages.
Salt River Project has 4 years of continuous EIA reporting on file (2020–2023), enough to read a real trend rather than a single-year snapshot. SAIDI climbed from 47.3 to 70.0 minutes over that window, a shift that can point to worsening weather exposure or delayed grid modernization.
SAIDI
70 min per year
Yearly outage minutes, on average (2023)
SAIFI
1.01 interruptions/yr
Average interruption count (2023)
Customers
1,141,630
Served in Arizona
70 outage minutes per customer annually
Annual minutes without electric service (2023)
| Year | SAIDI (min) | SAIDI nMED | SAIFI | Customers |
|---|---|---|---|---|
| 2020 | 47.3 | 40.8 | 0.751 | 1,072,666 |
| 2021 | 85.1 | 47.9 | 1.014 | 1,091,549 |
| 2022 | 81.4 | 49.9 | 1.088 | 1,113,592 |
| 2023 | 70.0 | 49.2 | 1.011 | 1,137,020 |
SAIDI nMED = SAIDI without major event days. Source: EIA Form 861.
Salt River Project serves 136 ZIP codes in Arizona.
Salt River Project had a SAIDI of 70.0 minutes in 2023. Leaving aside major weather events, that figure comes in under the national average, pointing to above-average reliability.
Salt River Project is classified as a Municipal serving Arizona.
Salt River Project serves approximately 1,141,630 customers in Arizona.
Salt River Project has 4 years of reliability data (2020-2023). This utility's SAIDI has stayed fairly flat over the period. Review the trend table above for year-by-year detail.
Source: U.S. Energy Information Administration Form 861 annual electric power industry survey · ZIP service territory: OpenEI. Disclaimer: informational only, not professional advice. See full disclaimer.
Every figure on PlainUtility is rendered directly from the U.S. Energy Information Administration's Form 861 reliability data, no number is typed in by an editor. This utility's SAIDI/SAIFI figures are rendered directly from EIA Form 861 reliability files. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2020-2023.