IOU · Texas · EIA 20404

AEP Texas North Company

IOU · Texas. According to the U.S. Energy Information Administration's EIA Form 861, reliability for 2023 shows SAIDI 145 minutes/customer.

Reliability verdict

AEP Texas North Company shows near-benchmark chronic reliability in 2023: 106 minutes SAIDI excluding major events.

145 min
SAIDI 2023
1.24
SAIFI 2023
106 min
SAIDI ex-MED

Chronic reliability judged on SAIDI excluding major event days when reported (IEEE 1366). Source: EIA Form 861 · August 2026.

Subscribe to EIA updates

Signature read: mid-cohort SAIDI between the 96 and 258 minute tercile cuts.

What mid-pack AEP Texas North Company filings show

AEP Texas North Company is an investor-owned utility operating in Texas under EIA identifier 20404. Customer count is not reported in the current EIA filing. Because it is investor-owned, the state public utility commission oversees its rate cases and reliability performance rather than a local board.

In 2023, the average AEP Texas North Company customer experienced 144.9 minutes of power interruptions, the industry-standard SAIDI metric (System Average Interruption Duration Index). That lands within the usual 120–180 minute national benchmark band, roughly on par with typical U.S. distribution-utility performance. SAIFI, the average number of outage events per customer, was 1.24 for the same period, so customers statistically faced roughly 1 distinct interruption that year. Once major event days (hurricanes, ice storms) are excluded, SAIDI comes down to 105.9 minutes, and the spread against the headline 144.9 indicates how much weather, versus routine infrastructure, drove the outage total.

With 4 consecutive years of EIA data (2020–2023), AEP Texas North Company's reliability record can be judged on trend rather than one isolated year. SAIDI has improved from 280.1 to 144.9 minutes over that window, a meaningful direction for prospective customers and regulators watching capital investment outcomes.

C-
Reliability Score
51/100
AEP Texas North Company · 3 of 3 dimensions reported

Based on this utility's own EIA Form 861 reliability record -- baseline (major-event- excluded) outage duration, total outage duration, and outage frequency -- each benchmarked against every reporting utility nationwide. Not a measure of electricity rates or customer service, which this portal does not track.

Baseline Reliability D 105.9 min/yr
SAIDI excluding major-event days — day-to-day grid performance
Total Outage Duration C- 144.9 min/yr
SAIDI including storms and major events — the full-year experience
Outage Frequency C- 1.24/yr
SAIFI — average number of interruptions per customer per year
SAIDI vs. national mean (341 min) 19.3%

145 min/year per customer

AEP Texas North Company SAIDI

Power-out minutes per year (2023)

145 SAIDI145 SAIDINat. avg 341341SAIDI145SAIDI

Excellent

SAIDI by year (2020-2023)

Minutes per customer-year · EIA Form 861

Year-by-year SAIDI for AEP Texas North Company from the same EIA filings as the table below. Lower is better; major-event years can spike the headline figure.

Source: U.S. EIA Form 861 As of August 2026

AEP Texas North Company SAIDI trend

0 200 400 600 800 1000 1200 2020 2021 2022 2023 280.1 1136.6 120.6 144.9
Year-by-year SAIDI from the same EIA filings as the table below. Lower is better; major-event years can spike the headline figure.

AEP Texas North Company vs the nationwide SAIDI distribution

Where this utility's headline SAIDI sits among every EIA Form 861 utility with a reported figure

145 Lower than most fewer outage minutes than 54% of 911 utilities

Utilities nationwide, banded by latest reported SAIDI (minutes)

Each bar is a band; taller bars hold more utilities. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source U.S. EIA Form 861 reliability filings · August 2026

SAIDI 2023 breakdown: 144.9 minutes

Reliability Trend (2020–2023)

Year SAIDI (min) SAIDI nMED SAIFI Customers
2020 280.1 114.1 1.674 195,031
2021 1136.6 113.9 2.724 196,515
2022 120.6 120.6 1.266 197,430
2023 144.9 105.9 1.239 198,209

SAIDI nMED = SAIDI without major event days. Source: EIA Form 861.

Frequently Asked Questions

How reliable is AEP Texas North Company?

AEP Texas North Company had a SAIDI of 144.9 minutes in 2023. Leaving aside major weather events, that figure sits close to the national average.

What type of utility is AEP Texas North Company?

AEP Texas North Company is classified as a IOU serving Texas.

How many customers does AEP Texas North Company serve?

AEP Texas North Company serves customers in Texas. Exact customer count data is not available in the current EIA filing.

How has AEP Texas North Company's reliability changed over time?

AEP Texas North Company has 4 years of reliability data (2020-2023). SAIDI has held roughly steady across these years. Review the trend table above for year-by-year detail.

Utility Profile

Type
IOU
State
Texas
Customers
-
EIA ID
20404

Source: U.S. Energy Information Administration Form 861 annual electric power industry survey · ZIP service territory: OpenEI. Disclaimer: informational only, not professional advice. See full disclaimer · methodology.