Municipal · Kentucky · EIA 7270
City of Glasgow - (KY)
Municipal · Kentucky · 7,562 customers. According to the U.S. Energy Information Administration's EIA Form 861, reliability for 2023 shows SAIDI 286 minutes/customer.
Reliability verdict
City of Glasgow - (KY) shows near-benchmark chronic reliability in 2023: 286 minutes SAIDI across 7,562 customers.
- 286 min
- SAIDI 2023
- 2.83
- SAIFI 2023
- 7,562
- Customers
Chronic reliability judged on SAIDI excluding major event days when reported (IEEE 1366). Source: EIA Form 861 · August 2026.
Signature read: long interruption minutes vs the 911 utility cohort (>258 min tercile cut).
What long-outage City of Glasgow - (KY) filings show
City of Glasgow - (KY) is a municipally-owned utility operating in Kentucky under EIA identifier 7270. It reports service to approximately 7,562 customer accounts and generated about $0.03 billion in annual electric revenue, with a service footprint spanning 2 ZIP codes. As a municipal utility, it is typically governed by a local board or city council and is exempt from federal income tax.
In 2023, the average City of Glasgow - (KY) customer experienced 286.3 minutes of power interruptions, a measure known as SAIDI, or System Average Interruption Duration Index. That falls inside the typical 120–180 minute national benchmark, in line with what most U.S. distribution utilities report. Over the same period, SAIFI (outage events per customer) was 2.83, putting the typical customer at roughly 3 distinct interruptions that year.
With 4 consecutive years of EIA data (2020–2023), City of Glasgow - (KY)'s reliability record can be judged on trend rather than one isolated year. SAIDI climbed from 68.3 to 286.3 minutes over that window, a shift that can point to worsening weather exposure or delayed grid modernization.
Based on this utility's own EIA Form 861 reliability record -- baseline (major-event- excluded) outage duration, total outage duration, and outage frequency -- each benchmarked against every reporting utility nationwide. Not a measure of electricity rates or customer service, which this portal does not track.
286 minutes per customer per year
Power-out minutes per year (2023)
SAIDI by year (2020-2023)
Minutes per customer-year · EIA Form 861
Year-by-year SAIDI for City of Glasgow - (KY) from the same EIA filings as the table below. Lower is better; major-event years can spike the headline figure.
City of Glasgow - (KY) SAIDI trend
City of Glasgow - (KY) vs the nationwide SAIDI distribution
Where this utility's headline SAIDI sits among every EIA Form 861 utility with a reported figure
286 Around the middle fewer outage minutes than 31% of 911 utilities
Utilities nationwide, banded by latest reported SAIDI (minutes)
Each bar is a band; taller bars hold more utilities. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.
Source U.S. EIA Form 861 reliability filings · August 2026
Reliability Trend (2020–2023)
| Year | SAIDI (min) | SAIFI | Customers |
|---|---|---|---|
| 2020 | 68.3 | 0.940 | - |
| 2021 | 262.5 | 0.940 | - |
| 2022 | 60.3 | 1.300 | - |
| 2023 | 286.3 | 2.830 | 7,607 |
Service Area
City of Glasgow - (KY) serves 2 ZIP codes in Kentucky.
Frequently Asked Questions
How reliable is City of Glasgow - (KY)?
City of Glasgow - (KY) had a SAIDI of 286.3 minutes in 2023. Excluding major weather events, this is near the national average.
What type of utility is City of Glasgow - (KY)?
City of Glasgow - (KY) is classified as a Municipal serving Kentucky.
How many customers does City of Glasgow - (KY) serve?
City of Glasgow - (KY) serves approximately 7,562 customers in Kentucky.
How has City of Glasgow - (KY)'s reliability changed over time?
City of Glasgow - (KY) has 4 years of reliability data (2020-2023). This utility's SAIDI has stayed fairly flat over the period. Review the trend table above for year-by-year detail.
Utility Profile
- Type
- Municipal
- State
- Kentucky
- Customers
- 7,562
- Annual Revenue
- $0.03B
- EIA ID
- 7270
Explore
Source: U.S. Energy Information Administration Form 861 annual electric power industry survey · ZIP service territory: OpenEI. Disclaimer: informational only, not professional advice. See full disclaimer · methodology.