Municipal · Tennessee · EIA 3855
Columbia Power System - (TN)
Municipal · Tennessee · 36K customers. According to the U.S. Energy Information Administration's EIA Form 861, reliability for 2023 shows SAIDI 198 minutes/customer.
Reliability verdict
Columbia Power System - (TN) shows near-benchmark chronic reliability in 2023: 177 minutes SAIDI excluding major events across 36K customers.
- 198 min
- SAIDI 2023
- 2.35
- SAIFI 2023
- 177 min
- SAIDI ex-MED
- 36K
- Customers
Chronic reliability judged on SAIDI excluding major event days when reported (IEEE 1366). Source: EIA Form 861 · August 2026.
Signature read: mid-cohort SAIDI between the 96 and 258 minute tercile cuts.
What mid-pack Columbia Power System - (TN) filings show
Columbia Power System - (TN) is a municipally-owned utility operating in Tennessee under EIA identifier 3855. It reports service to approximately 35,567 customer accounts and generated about $0.08 billion in annual electric revenue, with a service footprint spanning 2 ZIP codes. As a municipal utility, it is typically governed by a local board or city council and is exempt from federal income tax.
In 2023, the average Columbia Power System - (TN) customer experienced 197.8 minutes of power interruptions, a metric called SAIDI (System Average Interruption Duration Index). That lands within the usual 120–180 minute national benchmark band, roughly on par with typical U.S. distribution-utility performance. SAIFI, the average number of outage events per customer, was 2.35 for the same period, so customers statistically faced roughly 2 distinct interruptions that year. Excluding major event days (hurricanes, ice storms), SAIDI drops to 177.0 minutes, the gap between that figure and the headline 197.8 reveals how much weather, not day-to-day infrastructure, drove outages.
With 4 consecutive years of EIA data (2020–2023), Columbia Power System - (TN)'s reliability record can be judged on trend rather than one isolated year. SAIDI dropped from 988.6 to 197.8 minutes across that span, a direction regulators and prospective customers tend to watch closely.
Based on this utility's own EIA Form 861 reliability record -- baseline (major-event- excluded) outage duration, total outage duration, and outage frequency -- each benchmarked against every reporting utility nationwide. Not a measure of electricity rates or customer service, which this portal does not track.
198 min/year per customer
Minutes without power per year (2023)
SAIDI by year (2020-2023)
Minutes per customer-year · EIA Form 861
Year-by-year SAIDI for Columbia Power System - (TN) from the same EIA filings as the table below. Lower is better; major-event years can spike the headline figure.
Columbia Power System - (TN) SAIDI trend
Columbia Power System - (TN) vs the nationwide SAIDI distribution
Where this utility's headline SAIDI sits among every EIA Form 861 utility with a reported figure
198 Around the middle fewer outage minutes than 43% of 911 utilities
Utilities nationwide, banded by latest reported SAIDI (minutes)
Each bar is a band; taller bars hold more utilities. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.
Source U.S. EIA Form 861 reliability filings · August 2026
Price vs. reliability
Where Columbia Power System - (TN) sits on price vs. reliability
Among the 781 U.S. utilities large enough to report both revenue per customer and a recent outage record, Columbia Power System - (TN) charges more per customer than 37% of them, and is more reliable (lower SAIDI) than 47% of them, placing it in the quadrant where it pays less and is less reliable. Revenue per customer and outage minutes are independent figures: paying more does not guarantee fewer outages.
Revenue per customer: $2,328/year · Latest SAIDI: 197.8 minutes/year.
SAIDI 2023 breakdown: 197.8 minutes
Reliability Trend (2020–2023)
| Year | SAIDI (min) | SAIDI nMED | SAIFI | Customers |
|---|---|---|---|---|
| 2020 | 988.6 | 875.4 | 2.848 | 31,769 |
| 2021 | 97.5 | 73.9 | 2.778 | 32,897 |
| 2022 | 478.8 | 331.0 | 4.849 | 36,368 |
| 2023 | 197.8 | 177.0 | 2.348 | 35,567 |
SAIDI nMED = SAIDI without major event days. Source: EIA Form 861.
Service Area
Columbia Power System - (TN) serves 2 ZIP codes in Tennessee.
Frequently Asked Questions
How reliable is Columbia Power System - (TN)?
Columbia Power System - (TN) had a SAIDI of 197.8 minutes in 2023. Leaving aside major weather events, that figure sits close to the national average.
What type of utility is Columbia Power System - (TN)?
Columbia Power System - (TN) is classified as a Municipal serving Tennessee.
How many customers does Columbia Power System - (TN) serve?
Columbia Power System - (TN) serves approximately 35,567 customers in Tennessee.
How has Columbia Power System - (TN)'s reliability changed over time?
Columbia Power System - (TN) has 4 years of reliability data (2020-2023). This utility's SAIDI has stayed fairly flat over the period. Review the trend table above for year-by-year detail.
Utility Profile
- Type
- Municipal
- State
- Tennessee
- Customers
- 35,567
- Annual Revenue
- $0.08B
- EIA ID
- 3855
Explore
Utilities with similar EIA profiles
Two cross-state peer sets for Columbia Power System - (TN). Same-state SAIDI neighbors stay in Read-with below; these neighborhoods are nearest other-state utilities with at least 10,000 reported customers.
Similar customer count
Nearest utilities by Form 861 customers (36K here), outside Tennessee.
Similar chronic SAIDI
Nearest utilities by latest SAIDI minutes (197.8 here), outside Tennessee, excluding the customer-peer set.
Source: U.S. Energy Information Administration Form 861 annual electric power industry survey · ZIP service territory: OpenEI. Disclaimer: informational only, not professional advice. See full disclaimer · methodology.