SAIDI
73 min per year
Average outage minutes (2023)
City of Monroe - (NC) is a municipally-owned utility operating in North Carolina under EIA identifier 12801. It reports service to approximately 12,193 customer accounts and generated about $0.06 billion in annual electric revenue, with a service footprint spanning 2 ZIP codes. As a municipal utility, it is typically governed by a local board or city council and is exempt from federal income tax.
In 2023, the average City of Monroe - (NC) customer experienced 73.2 minutes of power interruptions — a metric called SAIDI (System Average Interruption Duration Index). That places this utility well below the 120–180 minute national benchmark, signaling strong grid hardening and fast restoration practices. SAIFI — the average number of outage events per customer — was 0.57 for the same period, so customers statistically faced roughly 1 distinct interruption that year. Excluding major event days (hurricanes, ice storms), SAIDI drops to 23.3 minutes — the gap between that figure and the headline 73.2 reveals how much weather, not day-to-day infrastructure, drove outages.
The EIA dataset includes 4 years of continuous reporting (2020–2023) for City of Monroe - (NC), which lets you see whether reliability is trending up or down rather than judging from a single snapshot. SAIDI has increased from 35.4 to 73.2 minutes, which may reflect either worsening weather exposure or delayed grid modernization. All figures on this page come directly from EIA Form 861, the federal annual electric power industry survey, with service territory ZIPs sourced from OpenEI — you can cross-reference them with your own utility bill or use them when comparing providers before relocating.
SAIDI
73 min per year
Average outage minutes (2023)
SAIFI
0.57 interruptions/yr
Outage frequency (2023)
Customers
12,193
Served in North Carolina
73 minutes per customer per year
Minutes without power per year (2023)
| Year | SAIDI (min) | SAIDI nMED | SAIFI | Customers |
|---|---|---|---|---|
| 2020 | 35.4 | 35.4 | 0.628 | 11,080 |
| 2021 | 73.4 | 36.4 | 0.757 | 11,080 |
| 2022 | 49.7 | 20.4 | 0.607 | 11,391 |
| 2023 | 73.2 | 23.3 | 0.566 | 12,498 |
SAIDI nMED = SAIDI without major event days. Source: EIA Form 861.
City of Monroe - (NC) serves 2 ZIP codes in North Carolina.
City of Monroe - (NC) had a SAIDI of 73.2 minutes in 2023, meaning the average customer experienced about 73 minutes of outages that year. This is below the national average, indicating above-average reliability.
City of Monroe - (NC) is classified as a Municipal serving North Carolina. Municipal utilities are owned and operated by local governments.
SAIDI (System Average Interruption Duration Index) measures the average total minutes per year that a customer of City of Monroe - (NC) experiences power outages. A lower SAIDI indicates better reliability. The national average is roughly 120-180 minutes per year, so comparing City of Monroe - (NC)'s SAIDI to that benchmark shows whether this utility is above or below average.
City of Monroe - (NC) serves approximately 12,193 customers in North Carolina. Customer count can affect reliability metrics because larger utilities may face different infrastructure challenges compared to smaller ones.
City of Monroe - (NC) has 4 years of reliability data (2020-2023). SAIDI has remained relatively stable over this period. Review the trend table above for year-by-year detail.
SAIDI "without major event days" (SAIDI nMED) excludes outages caused by hurricanes, ice storms, and other catastrophic weather events. It better reflects day-to-day infrastructure reliability rather than vulnerability to extreme weather. Both standard SAIDI and SAIDI nMED are shown in the reliability trend table above.
Disclaimer: This information is provided for informational purposes only and does not constitute professional advice. Data is sourced from the U.S. Energy Information Administration (EIA) Form 861. Consult a qualified professional before making decisions based on this data.
Read our methodology — how this data is sourced, computed, and verified.