State · EIA Form 861 · NM

New Mexico

According to the U.S. Energy Information Administration's EIA Form 861, SAIDI and SAIFI for New Mexico utilities come from the federal annual survey. 12 utilities report reliability metrics; figures are customer-weighted state averages, not a guarantee for any single address.

Signature read: mid-cohort SAIDI between the 156 and 365 minute tercile cuts (51 states with averages).

EIA Form 861 · Continuity Brief

New Mexico

EIA Form 861 Continuity Brief · August 2026 · IEEE 1366 SAIDI/SAIFI minutes, not a storm forecast.

New Mexico sits mid-pack on SAIDI at 167.3 minutes across 12 EIA Form 861 utilities, spanning Los Alamos County lowest at 27.2 to Central New Mexico El Coop, Inc highest at 694.0.

SAIDI min/cust-yr
167.3
SAIFI events/yr
1.23
UTILS reporting
12
FILE w/ reliability
12
CUST accounts
1.4M
RANK# by headcount
#30/51
BEST lowest SAIDI
27
WORST highest SAIDI
694

State SAIDI neighbourhood (minutes / customer-year)

  • New Mexico 167.3
  • Connecticut 168.7
  • Florida 160.1
  • Washington 158.2
  • Wyoming 156.2
  • Wisconsin 184.2

Lower is fewer interruption minutes. Neighbours are nearest other-state averages in this corpus.

New Mexico vs all states by EIA Form 861 utility headcount

Where this state's reporting utility count sits among every state in the Form 861 file (coverage density, not reliability quality)

12 Top 61% more reporting utilities than 39% of 51 states

States, banded by electric utilities reporting on EIA Form 861

Each bar is a band; taller bars hold more states. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source EIA Form 861 · 2026-08-30

Utilities Ranked by Reliability

All 12 electric utilities in New Mexico with reliability data, sorted by 2023 SAIDI (fewest outage minutes first).

Lowest-SAIDI utilities in New Mexico

Fewest outage minutes · live table sort

Top 10 New Mexico utilities by fewest outage minutes. Lower SAIDI is better - not a quality score beyond interruption duration.

Source: U.S. EIA Form 861 As of August 2026

Lowest-SAIDI utilities in New Mexico

1. Los Alamos County27.222. City of Farmington - (NM)92.943. Public Service Co of NM105.994. El Paso Electric Co106.825. Lea County Electric Coop,…171.936. Farmers Electric Coop, In…2137. Continental Divide El Coo…222.48. Southwestern Public Servi…256.069. Central Valley Elec Coop,…324.710. Kit Carson Electric Coop…399.74
Top 10 by fewest outage minutes (live table sort). Lower SAIDI is better - not a quality score beyond interruption duration.
0 min400 minNational mean341min167.3min
New Mexico customer-weighted average SAIDI is 167.3 minutes versus the national mean of 341 minutes (EIA Form 861). Lower is better; statewide means are not a guarantee for any address.
# Utility Type SAIDI 2023 SAIFI 2023 Customers
1 Los Alamos County Municipal 27.2 0.26 9,275
2 City of Farmington - (NM) Municipal 92.9 1.00 44,935
3 Public Service Co of NM IOU 106.0 0.84 548,019
4 El Paso Electric Co IOU 106.8 1.14 349,813
5 Lea County Electric Coop, Inc - (NM) Cooperative 171.9 2.58 11,244
6 Farmers Electric Coop, Inc - (NM) Cooperative 213.0 1.74 13,598
7 Continental Divide El Coop Inc Cooperative 222.4 2.28 23,468
8 Southwestern Public Service Co IOU 256.1 1.39 279,501
9 Central Valley Elec Coop, Inc Cooperative 324.7 2.53 14,945
10 Kit Carson Electric Coop, Inc Cooperative 399.7 1.28 30,420
11 Jemez Mountains Elec Coop, Inc Cooperative 668.1 3.43 31,616
12 Central New Mexico El Coop, Inc Cooperative 694.0 6.40 18,991

Nationwide states with similar utility inventory or customer scale

Two cross-state peer sets for New Mexico. Nearest-SAIDI neighbors stay in Read-with below; these neighborhoods compare EIA Form 861 headcount and summed customer accounts.

Similar utility headcount

Nearest states by reporting utility count (12 here).

Similar customer scale

Nearest states by summed customer accounts (1.4M here), excluding the headcount peer set.

Source: U.S. Energy Information Administration (EIA) Form 861 Annual Electric Power Industry Report, reliability · 2020-2023 State averages are rebuilt from utility filings in this portal DB; corpus ranks use headcount and customer sums.